Refine Your Search

Search Results

Author:
Viewing 1 to 7 of 7
Journal Article

The Ford Rolling Road Wind Tunnel Facility

2023-04-11
2023-01-0654
The Ford Motor Company Rolling Road Wind Tunnel (RRWT) is a state-of-the-art aerodynamic wind tunnel test facility in Allen Park, Michigan. The RRWT has operated since January 2022 and is designed for passenger and motorsport vehicle development. The test facility includes an office area, three secure customer vehicle preparation bays, a garage area, a vehicle frontal area measurement system, and a full-scale ¾ open jet wind tunnel. The wind tunnel features an interchangeable single belt and 5-belt Moving Ground Plane (MGP) system with an integrated 6-component balance, a two-position nozzle, boundary layer removal systems, and two independent flow traverse systems. Each flow traverse has a large horizontal box beam and vertical Z-strut that can position the flow traverse accurately within the test volume.
Technical Paper

General Motors Full Scale Wind Tunnel Upgrade

2020-04-14
2020-01-0687
The General Motors Aero Lab’s Full-Scale Wind Tunnel Facility, which came into operation in August of 1980[1], has undergone the significant upgrade of installing a state-of-the-art moving ground plane system. After almost four decades of continuous use the full-scale wind tunnel also received some significant maintenance to other areas, including a new heat exchanger, main fan overhaul, and replacement of the test section acoustic treatment. A 5-belt system was installed along with an integrated vehicle lift system. The center belt measures 8.5m long and can accommodate two belt widths of 1100mm and 950mm. Flow quality and other wind tunnel performance parameters were maintained to prior specifications which are on par with the latest industry standards [2]. The new 5-belt rolling road system maintains GM’s industry leading vehicle aerodynamic development and the improved acoustic panels ensure GM continues to develop vehicles with leading class acoustics.
Journal Article

General Motors’ New Reduced Scale Wind Tunnel Center

2017-03-28
2017-01-1534
The General Motors Reduced Scale Wind Tunnel Facility, which came into operation in the fall of 2015, is a new state-of-the-art scale model aerodynamic test facility that expands GM’s test capabilities. The new facility also increases GM’s aerodynamic testing through-put and provides the resources needed to achieve the growing demand for higher fuel economy requirements for next generation of vehicles. The wind tunnel was designed for a nominal model scale of 40%. The nozzle and test section were sized to keep wind tunnel interference effects to a minimum. Flow quality and other wind tunnel performance parameters are on par with or better than the latest industry standards. A 5-belt system with a long center belt and boundary layer suction and blowing system are used to model underbody flow conditions. An overhead probe traverse system is installed in the test section along with a model positioning robot used to move the model in an out of the test section.
Journal Article

Scania’s New CD7 Climatic Wind Tunnel Facility for Heavy Trucks and Buses

2016-04-05
2016-01-1614
Scania AB has opened the new CD7 climatic wind tunnel test facility, located at the Scania Technical Center in Södertälje, Sweden. This facility is designed for product development testing of heavy trucks and buses in a range of controllable environments. Having this unique test environment at the main development center enables Scania to test its vehicles in a controlled repeatable environment year round, improving lead times from design to production, producing higher quality and more reliable vehicles, and significantly improves the capability for large vehicle performance research. This state-of-the-art facility provides environmental conditions from -35°C to 50°C with humidity control from 5 to 95 percent. The 13 m2 nozzle wind tunnel can produce wind speeds up to 100 km/h. The dynamometer is rated at 800 kW for the rear axle and 150 kW for the front axle, which also has ±10° yaw capability.
Journal Article

Progress in Aeroacoustic and Climatic Wind Tunnels for Automotive Wind Noise and Acoustic Testing

2013-04-08
2013-01-1352
There has been significant progress in developing test facilities for automotive wind noise and automotive components since the early 1990s. The test technology is critical to the development of modern vehicles, and essentially every major automotive manufacturer owns and operates their own aeroacoustic wind tunnel, or has rental access to one and conducts a significant amount of wind noise testing. The current status for climatic wind tunnels is that many new CWTs are being defined with acoustic test requirements. These test capabilities in AAWTs and CWTs will continue to enable the development of vehicles with better wind noise attributes, fewer problems with sunroof ‘booming’, and lower noise levels for HVAC and auxiliary systems. In the future, it is expected that the test demand for AAWTs and CWTs with low acoustic background noise will continue to increase as customers expect better automotive products, especially across more of the product line.
Technical Paper

Uncertainty Analysis of Aerodynamic Coefficients in an Automotive Wind Tunnel

2005-04-11
2005-01-0870
This paper presents an uncertainty analysis of aerodynamic force and moment coefficients for production vehicles in an automotive wind tunnel. The analysis uses a Monte Carlo numerical simulation technique. Emphasis is placed on defining the elemental random and systematic uncertainties from the tunnel’s instrumentation, understanding how they propagate through the data reduction equations and under what conditions specific elemental error sources are or are not important, and how the approach to data reduction influences the overall uncertainties in the coefficients. The results of the analysis are used to address the issue of averaging time in the context of maintaining a maximum allowable uncertainty level. Also, a maximum error requirement in the vehicle’s installation is suggested to allow the use of rapid but approximate vehicle alignment methods without incurring errors that exceed the data uncertainty. Observed reproducibility results are presented spanning a 16 month period.
Technical Paper

The Driveability Test Facility Wind Tunnel No. 8

2002-03-04
2002-01-0252
The Sverdrup Driveability Test Facility (DTF) represents a new type of partnership in automotive testing between a supplier (Sverdrup Technology) and an original equipment manufacturer (Ford Motor Company). The facility was designed and built by Sverdrup to Ford's specifications. It is also operated and maintained by Sverdrup, with Ford as its “anchor” client under a long-term lease-back arrangement. Test time that goes unused by Ford is made available to other customers. Wind Tunnel 8 (WT8) is one of the test facilities within the DTF, which includes two other climatic wind tunnels and several supporting test cells. This tunnel combines aerodynamic, acoustic, climatic, and powertrain capabilities within one facility. The airline was optimized during the design stage for the competing requirements of excellent flow quality, very low background noise, and climatic capability.