Browse Standards AS683E
Current REVISED 2019-10-28

Installation Procedures and Torques for Fluid Connections AS683E

These procedures cover the following:
  1. Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
  2. Section 4 - Boss end connections, positioned type, with back-up ring.
  3. Section 5 - Boss end connections, positioned type, without back-up ring.
  4. Section 6 - Boss end connections, non-positioned type.
  5. Section 7 - Bulkhead connections.
AS683E
2019-10-28
Latest
Revised
AS683D
2012-03-01
Historical
Revised
AS683C
2006-05-04
Historical
Reaffirmed
AS683B
1995-05-01
Historical
Reaffirmed
AS683A
1976-09-01
Historical
Revised

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 10% off list price.
Login to see discount.
Special Offer: AeroPaks offers a customized subscription plan that is cost-effective and allows you to choose the number of downloads and Aerospace and Aerospace Material documents you need. Find more information here.
We also recommend:
STANDARD

Coupling Assembly, Hydraulic, Self-Sealing, Quick Disconnect

AS25427

View Details

STANDARD

Test Methods, Hose Assemblies, Polytetrafluoroethylene (PTFE)

AS2078A

View Details

STANDARD

General Gland Design Criteria for Static and Dynamic O-Ring Seal Applications Specifically for Engines and Engine Control Systems

ARP1231C

View Details

Get Involved

Want to participate in updating this standard?

X