Rationale:
PROCUREMENT SPECIFICATION NOTE ADDED TO SHEET 1 TEMPLATE. GRAPHICS REDRAWN FOR CLARITY. “TOL” ADDED TO TRUE POSITION BOXES WITHIN GRAPHICS. ELECTRO CHEM ETCH ADDED TO IDENTIFICATION NOTE. TABLE 1 REFORMATTED, IS NOW TABLE 1A AND 1B. MAXIMUM PRESSURE REMOVED FROM HEAT TREATMENT NOTE, TO ALIGN WITH INFORMATION ON PROCUREMENT SPECIFICATION. DRY FILM LUBRICATION NOTE REMOVED AS THIS IS A SYSTEM INSTALLATION REQUIREMENT AND NOT PART OF THIS STANDARD. ALLOWABLE OVERALL LENGTH RANGE INCREASED, SEE NOTE /8/. QML NOTE ADDED. EXAMPLE OF PART NUMBER NOTE REDRAWN FOR CLARITY. REVISION INDICATOR NOTE AND DISPOSITION ON EXISTING INVENTORY NOTE ADDED. GENERAL UPDATES INCORPORATED.
Included in: Fluid Conductors and Connectors Subscription Learn More
Related Topics:
Corrosion resistant alloys
Heat treatment
Tensile strength
Logistics
Suppliers
Also known as: SAE AS 4108/3
SAE MOBILUS
Subscribers can view annotate, and download all of SAE's content.
Learn More »