Refine Your Search

Search Results

Viewing 1 to 9 of 9
Technical Paper

Off-normal Situations Related to the Operation of the Electron-VM Oxygen Generation System aboard the International Space Station

2005-07-11
2005-01-2803
The Electron-VM Oxygen Generation System (OGS) is a main source of oxygen for crew breathing on the International Space Station (ISS) and the result of updating the Electron-V OGS that has been in successful operation for 17 years on Mir Space Station. The successful accomplishment of a manned flight program primarily has resulted in the stable operation of the system. The paper deals with analysis of off-normal situations related to the operation of the Electron-VM on board ISS. The system switching-off analysis based on the telemetry information processing and the results of the additional tests conducted under flight and ground conditions is performed. A principal cause of system switching-offs is a reduction in the pressure built by the circulating pumps due to ingress of gas bubbles into the suction pipeline. The results of the Electron-VM OGS switching-off analysis and the practical recommendations regarding its prevention are reviewed.
Technical Paper

Water Supply of the Crew of a Space Station Through Water Recovery and Water Delivery: SRV-K and SPK-U System Operation on ISS

2005-07-11
2005-01-2806
The paper summarizes the experience gained with the ISS water management system during the missions ISS-1 through ISS-10 (since November 2 2000, through November 30, 2004). The water supply sources and structure, consumption and supply balance and balance specifics at various phases of space station operation are reviewed. The performance data of the system for water recovery from humidity condensate SRV-K and urine feed and pretreatment system SPK-U in the Russian orbital segment are presented. The key role of water recovery on board the ISS and the need to supplement the station’s water supply hardware with a system for water reclamation from urine SRV-U is emphasized. The prospects of regenerative water supply system development are considered.
Technical Paper

Operation Results Onboard the International Space Station and Development Tendency of Atmosphere Revitalization and Monitoring System

2004-07-19
2004-01-2494
The Regenerative Atmosphere Revitalization and Monitoring system (ARMS), been part of Integrated Life Support System (ILSS), is intended for maintenance in the manned modules of a necessary chemical composition of an artificial gas atmosphere (AGA) on base of the crew metabolism product transform to environment initial components. Generally, the ARMS structure includes the individual systems and units intended for: → oxygen generation; → carbon dioxide removal and it concentration; → trace contaminants removal; → carbon dioxide reduction with the goal to produce an additional quantity of water necessary to increase the degree of the oxygen loop clousure. The ARMS structure of the International Space Station (ISS) Russian Segment (RS) includes the Electron-VM Oxygen Generation System (OGS), Vozdukh Carbon Dioxide Removal System (CDRS) and SBMP Trace Contaminants Removal Means (TCRM) installed in the Service Module.
Technical Paper

SRV-K Status aboard the International Space Station and Water Recovery Future Prospects

2004-07-19
2004-01-2489
The paper deals with the performance data of the service module Zvezda integrated water supply system of the International Space Station (ISS) as of March 31, 2004. The water supply and demand balance are analyzed. It is shown that water recovery from humidity condensate has been especially important when water delivery by Space Shuttles was terminated. The SRV-K contribution in potable water supply for crew needs was up to 76%. The data of humidity condensate and recovered water compositions are reviewed. The effective cooperation of the international partners on part of life support is shown. Water recovery future prospects are discussed.
Technical Paper

Water Recovery and Urine Collection Abord the International Space Station

2003-07-07
2003-01-2622
The paper deals with the performance data of the service module Zvezda water supply and urine collection systems of the International Space Station (ISS) as of December 31, 2002. The water supply and demand balance are analyzed. The data of humidity condensate and recovered water compositions are reviewed. The effective cooperation of the international partners on part of life support is shown.
Technical Paper

Water Recovery and Oxygen Generation by Electrolysis Aboard the International Space Station

2002-07-15
2002-01-2358
The paper deals with the construction and performance data of the service module Zvezda water and oxygen supply systems of the International Space Station (ISS). The performance data at the first 14 months of manned station functioning are provided. The data of humidity condensate and recovered water compositions are reviewed. The water supply and demand balance are analyzed. The system of oxygen generation “Electron-VM” and its functioning results are reviewed. The effective cooperation of the international partners on part of life support is shown.
Technical Paper

Water Recovery and Urine Collection in the Service Module of the International Space Station

2001-07-09
2001-01-2355
The paper deals with the construction and performance data of the service module Zvezda water supply system of the International Space Station (ISS). The performance data at an initial phase of manned station functioning are provided. The data on humidity condensate and recovered water composition are reviewed. The water supply and demand balance are analyzed. The effective cooperation of international partners on part of water supply for the crew is shown.
Technical Paper

Experience in Development and Long-term Operation of Mir's System for Oxygen Generation by Electrolysis

2000-07-10
2000-01-2356
The paper describes the design specifics of the system for oxygen generation by electrolysis Elektron and major results obtained in long-term operation of the system aboard space station Mir. Operational data analysis makes possible to draw a conclusion that the system is capable to attain life parameters for at least 2 years with maintaining serviceability for no less than 8 years without attendance and unit replacement. Based on flight operation the possibility of reducing power consumption by 10 per cent is proven. System design updates are realized in the water electrolysis system intended for the Russian segment of the international space station.
Technical Paper

A Regenerative Water Supply System for the ISS Russian Segment

1999-07-12
1999-01-1951
This paper reviews the design and properties of the Water Supply System (WSS). It also discusses the water balance and its delivery amounts, as well as it presents diagrams and properties of water recovery system from humidity condensate WRS-CM and regeneration from urine WRS-UM which are the part of WSS. Some results of activities conducted for provision of water intake in a system of WRS-CM from different modules of station are shown and the problems of WSS interaction of Russian segment (RS) and American segment (USOS) of the International Space Station (ISS) are discussed.
X