1983-02-01

Advanced Integrated Propulsion System (AIPS) for Future Main Battle Tank (MBT) 830504

In August of 1982, the US Army Tank-Automotive Command (TACOM), initiated the first phase of the Advanced Integrated Propulsion System (AIPS) program by awarding six design analysis contracts. The AIPS program is aimed at competitively developing and producing a power package for application to the future heavy combat vehicle weight class. This paper reviews the purpose, schedule, target goals, and acquisition strategy of the AIPS program.
The AIPS development differs from past programs in several ways. Technically, the engine, transmission and other subsystems will be designed and developed together as a totally integrated propulsion system. With regard to management of the program, the Government is examining acquisition strategies with the intent of insuring competition throughout all phases (research, development, and production) and achieving the simultaneous qualification of two production sources. The final acquisition strategy has yet to be determined.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Powertrain Simulation of the M1A1 Abrams Using Modular Model Components

980926

View Details

TECHNICAL PAPER

Development of Refuse Vehicle Driving and Duty Cycles

2005-01-1165

View Details

TECHNICAL PAPER

Statistical Distribution Model of Field Reliability Based on Phased Weibull Distribution

2007-01-3526

View Details

X