Biomass Production System (BPS) Ground Based Performance Testing 2002-01-2482
The longest BPS ground test to-date was the BPS Mission Verification Test done to provide a high fidelity end-to-end system test of BPS hardware and operations. This test took place at Kennedy Space Center from 4/9/01 to 6/21/01. The BPS temperature and humidity control, atmospheric control, lighting, and nutrient delivery systems performed within specifications. Ambient temperature conditions for the test ranged from 22°C to 28°C. Temperature systems performed well over the full range of ambient conditions and temperature setpoints were maintained throughout the test. Humidity setpoints were maintained within specification under nominal conditions; however, drift in humidity was observed during high ambient temperatures with large plant load conditions, and during CO2 drawdowns. CO2 levels in the wheat chambers were within ± 10% of setpoint under nominal conditions. Several automated CO2 drawdowns and CO2 cylinder changeouts were successfully completed. The ethylene scrubber maintained ethylene levels below 50 ppb. Plant growth was initiated in a total of eight root modules. BPS operations from preflight preparation through flight and postflight were demonstrated to be capable of supporting all hardware validation and science requirements.
Citation: Morrow, R., Frank, J., Stolp, K., and Lee, M., "Biomass Production System (BPS) Ground Based Performance Testing," SAE Technical Paper 2002-01-2482, 2002, https://doi.org/10.4271/2002-01-2482. Download Citation
Author(s):
R. C. Morrow, J. G. Frank, K. M. Stolp, M. C. Lee
Affiliated:
Orbital Technologies Corporation
Pages: 13
Event:
International Conference On Environmental Systems
ISSN:
0148-7191
e-ISSN:
2688-3627
Related Topics:
Humidity
Engine cylinders
Hardware
SAE MOBILUS
Subscribers can view annotate, and download all of SAE's content.
Learn More »