Browse Publications Technical Papers 1999-01-3426
1999-10-06

Once-Up / One-Pass Drilling Process, C-17 Cargo Ramp Skin Assembly 1999-01-3426

As an ongoing effort to achieve affordability goals and obtain additional aircraft orders, the C-17 program has developed and implemented a once-up / one-pass drilling process for the C-17 Cargo Ramp center skin to frame assembly operation. Traditionally, the aircraft assembly build process consists of the following steps: part assembly, multi-pass hole drilling, part disassembly, hole deburring, fay sealing, part re-assembly, and fastener installation. The once-up / one-pass drilling process reduces this sequence to: fay sealing, part assembly, one-pass hole drilling, and fastener installation. The new process will provide a significant recurring cost savings and cycle time reduction to the program by eliminating the labor and time-intensive efforts of disassembling, deburring, and re-assembling a skin panel 230 inches by 80 inches in size. This once-up / one-pass process has been achieved through a combination of assembly sequence changes, clamping method development, and drill motor / cutter system design.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

A Mouldable Thermoplastic Interface for Advanced Composite Components to Reduce Costs in Aircraft Assembly

2005-01-3310

View Details

TECHNICAL PAPER

FRAC (Frame Riveter Assembly Cell)

2016-01-2079

View Details

JOURNAL ARTICLE

Flex Track One Sided One Up Assembly

2014-01-2274

View Details

X