Refine Your Search

Search Results

Author:
Viewing 1 to 6 of 6
Journal Article

Performance of the Extravehicular Mobility Unit (EMU) Airlock Coolant Loop Remediation (A/L CLR) Hardware Phase II

2009-07-12
2009-01-2541
An EMU water processing kit (Airlock Coolant Loop Recovery – A/L CLR) was developed as a corrective action to Extravehicular Mobility Unit (EMU) coolant flow disruptions experienced on the International Space Station (ISS) in May of 2004 and thereafter. Conservative schedules for A/L CLR use and component life were initially developed and implemented based on prior analysis results and analytical modeling. The examination of post-flight samples and EMU hardware in November of 2006 indicated that the A/L CLR kits were functioning well and had excess capacity that would allow a relaxation of the initially conservative schedules of use and component life. A relaxed use schedule and list of component lives were implemented thereafter. Since the adoption of the relaxed A/L CLR schedules of use and component lives, several A/L CLR kit items, transport loop water samples and sensitive EMU transport loop components have been examined to gage the impact of the relaxed requirements.
Journal Article

Performance of the Extravehicular Mobility Unit (EMU) Airlock Coolant Loop Remediation (A/L CLR) Hardware

2008-06-29
2008-01-2060
Following the Columbia accident, the EMUs (Extravehicular Mobility Units) onboard the ISS (International Space Station) went unused for an extended period of time. Upon startup, the units experienced a failure in the coolant systems. The failure resulted in a loss of EVA (Extravehicular Activity) capability from the US segment of the ISS. A failure investigation determined that chemical and biological contaminants and byproducts from the ISS Airlock Heat Exchanger, and the EMU itself, fouled the magnetically coupled pump in the EMU Transport Loop Fan/Pump Separator leading to a lack of coolant flow. Remediation hardware (the Airlock Coolant Loop Remediation water processing kit) and a process to periodically clean the EMU coolant loops on orbit were devised and implemented. The intent of this paper is to report on the successful implementation of the resultant hardware and process, and to highlight the go-forward plan.
Technical Paper

International Space Station Metal Oxide Odor Anomaly

2004-07-19
2004-01-2598
On occasion, seemingly normal operations can have significant effects upon the closed environment of the International Space Station (ISS). An example of such a case occurred on February 20, 2002 when a nominal Metal Oxide (MetOx) canister regeneration operation onboard the ISS resulted in an unexpected, foul odor that affected the crew and station operations. A case study summarizing the root cause for the event and steps taken to ensure that future MetOx regeneration operations proceed safely is presented. Included in the summary are engineering analyses and environmental monitoring results supporting the root cause assessment as well as testing conducted and flight operations changes implemented to ensure safe operations.
Technical Paper

International Space Station Environmental Control And Life Support System Status: 2001-2002

2002-07-15
2002-01-2494
The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between May 2001 and April 2002. The ISS continued permanent crew operations, with Phase 2 completion accomplished during this period. Work continued on the Phase 3 elements with Node 3 proceeding toward a final design review and the regenerative ECLS equipment proceeding into manufacturing.
Technical Paper

Development of a Solid Chlorate Backup Oxygen Delivery System for the International Space Station

2000-07-10
2000-01-2348
The International Space Station (ISS) Program requires that there always be a 45 calendar day contingency supply of breathing oxygen. In the early assembly stages, there is only one flight system, the Russian Solid Fuel Oxygen Generator (SFOG), which can meet that requirement. To better ensure the contingency oxygen supply, the Crew and Thermal Systems Division was directed to develop a flight hardware system that can meet all contingency oxygen requirements for ISS. Such a system, called the Backup Oxygen Candle System (BOCS), has been built and tested. The BOCS consists of 33 chlorate candles, a thermal containment apparatus, support equipment and packaging. The thermal containment apparatus utilizes the O2 produced by the candle as the motive stream in an ejector to passively cool the candle during operation.
Technical Paper

Performance of the Water Recovery System During Phase II of the Lunar-Mars Life Support Test Project

1997-07-01
972417
The recovery of potable water from waste water produced by humans in regenerative life support systems is essential for success of long-duration space missions. The Lunar-Mars Life Support Test Project (LMLSTP) Phase II test was performed to validate candidate technologies to support these missions. The test was conducted in the Crew and Thermal Systems Division (CTSD) Life Support Systems Integration Facility (LSSIF) at Johnson Space Center (JSC). Discussed in this paper are the water recovery system (WRS) results of this test. A crew of 4-persons participated in the test and lived in the LSSIF chamber for a duration of 30-days from June 12 to July 12, 1996. The crew had accommodations for personal hygiene, the air was regenerated for reuse, and the waste water was processed to potable and hygiene quality for reuse by the crew during this period. The waste water consisted of shower, laundry, handwash, urine and humidity condensate.
X