Refine Your Search

Search Results

Technical Paper

Thermal Control Design of the European Robotic Arm (ERA)

1997-07-01
972526
As part of the European contribution to the Russian segment of the International Space Station (ISS), the European Robotic Arm (ERA) is designed under contract from the European Space Agency by Fokker Space as the Prime contractor. After the launch in 1999, ERA operations will first begin with the assembly of the Russian segment and then later continue with the routine tasks such as inspection, maintenance, freight handling, etc. The particularly challenging aspect of the ERA thermal design is to enable ERA to operate under all possible, but wide, in-orbit thermal environmental conditions which are to be experienced throughout its 10 year life. These can be between the extreme cold conditions without sunlight for hibernation to the extreme hot conditions with ERA operating in full sunlight in close vicinity to a large station item, for instance, the solar arrays.
X