Refine Your Search

Search Results

Journal Article

An Enhanced Risk Reduction Methodology for Complex Problem Resolution in High Value, Low Volume Manufacturing Scenarios

2015-09-15
2015-01-2595
This paper reports on a methodology for risk reduction, developed and tested at a brand new aerospace manufacturing facility, producing high value aero-structures. The facility was formed as part of a ‘Risk Sharing Partnership’ between Airbus and GKN for production of the Airbus A350 ‘Fixed Trailing Edge’ (FTE). Whilst operating in New Product Introduction (NPI), the challenge for GKN was to increase production volume for each successive year of operations. At the time of writing, the facility was producing FTE structures at a rate of 4 per month i.e. Rate 4, and attempting to transition to Rate 6. The ultimate aim was to produce FTE structures at Rate 13 within an 8 year period whilst concurrently engineering the product and improving its processes. For schedule adherence, elimination of process failures was critical and often manifested at the final stage of assembly (integration cell).
X