Refine Your Search

Search Results

Author:
Viewing 1 to 2 of 2
Journal Article

Technical Improvements to the ASAT2 Boeing 777 Spar Assembly Cell

2011-10-18
2011-01-2707
Electroimpact and Boeing are improving the efficiency and reliability of the Boeing 777 spar assembly process. In 1992, the Boeing 777 spar shop installed Giddings and Lewis spar machines with Electroimpact Inc. EMR(1) (Electromagnetic Riveting) technology. In 2011, Electroimpact Inc. began replacing the original spar machines with next generation assembly machines. The new carriages incorporate a number of technical improvements and advancements over the current system. These technical advancements have facilitated a 50% increase in average cycle rate, as well as improvements to overall process efficiency, reliability and maintainability. Boeing and Electroimpact have focused on several key technology areas as opportunities for significant technical improvements.
Technical Paper

Refurbishment of 767 ASAT Drill-Rivet-Lockbolt Machines

2010-09-28
2010-01-1844
Boeing has relied upon the 767 ASAT (ASAT1) since 1983 to fasten the chords, stiffeners and rib posts to the web of the four 767 wing spars. The machine was originally commissioned with a Terra five axis CNC control. The Terra company went out of business and the controls were replaced with a custom DOS application in 1990. These are now hard to support so Boeing solicited proposals. Electroimpact proposed to retrofit with a Fanuc 31I CNC, and in addition, to replace all associated sensors, cables and feedback systems. This work is now complete on two of the four machines. Both left front and right front are in production with the new CNC control.
X