Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

Incorporating the FMVSS 201U Laboratory Experience in Simulation Using IHIT

2010-04-12
2010-01-1018
FMVSS 201U, interior head impact performance is required for each new vehicle program. In the laboratory, testing to this requirement includes laying out the target locations, defining additional robustness target points based on targeting variation, positioning the Free Motion Headform (FMH), impacting each location with the headform and measuring HIC values. The tests may involve some conservative strategies and robustness studies to protect for the worst-case scenarios, where an impact might produce the highest HIC(d) within variations of impact conditions. In order to automate the best practices and procedures for both laboratory and CAE, a process automation environment was used to develop the Interior Head Impact Toolkit (IHIT, pronounced as i-hit). The IHIT software addresses several key testing processes and is grouped into four modules.
Technical Paper

Process Automation for Finite Element (FE) Anthropomorphic Test Device (ATD) Development - a Neck Pendulum Certification Case Study using Visual-SDK

2010-04-12
2010-01-0259
Process automation is one of the emerging technologies in the field of computer aided engineering (CAE). A majority of the CAE processes involve repetitive steps during the product development and enhancement phases. An effort is being made to improve the engineer's efficiency by automating the repetitive tasks. The objective of the current study is to demonstrate the capabilities of CAE or FE process automation. Using a CAE process authoring and execution environment, a process was developed for the standard neck pendulum certification for the FE Hybrid III 5th percentile female ATD model. Standard pre-processing tasks for the typical neck pendulum certification simulation such as ATD head/neck replacement and positioning, resolving connections, quality checks, boundary and loading conditions, contact definitions, etc. were defined as process steps. Solver execution and post-processing were also made part of the process automation for the review of results and report generation.
X