Journal Article

11 Reasons to Use Automated Metrology

2019-03-19
2019-01-1369
Aerospace structures manufacturers find themselves frequently engaged in large-scale 3D metrology operations, conducting precision measurements over a volume expressed in meters or tens of meters. Such measurements are often done by metrologists or other measurement experts and may be done in a somewhat ad-hoc fashion, i.e., executed in the most appropriate method according to the lights of the individual conducting the measurement. This approach is certainly flexible but there are arguments for invoking a more rigorous process. Production processes, in particular, demand an automated process for all such “routine” measurements. Automated metrology offers a number of advantages including enabling data configuration management, de-skilling of operation, real time input data error checking, enforcement of standards, consistent process execution and automated data archiving. It also reduces training, setup time, data manipulation and analysis time and improves reporting.
Technical Paper

Unique Material Handling and Automated Metrology Systems Provides Backbone of Accurate Final Assembly Line for Business Jet

2016-09-27
2016-01-2104
Figure 1 Global 7000 Business Jet. Photo credit: Robert Backus. The customer’s assembly philosophy demanded a fully integrated flexible pulse line for their Final Assembly Line (FAL) to assemble their new business jets. Major challenges included devising a new material handling system, developing capable positioners and achieving accurate joins while accommodating two different aircraft variants (requiring a “flexible” system). An additional requirement was that the system be easily relocated to allow for future growth and reorganization. Crane based material handling presents certain collision and handover risks, and also present a logistics challenge as cranes can become overworked. Automated guided vehicles can be used to move large parts such as wings, but the resulting sweep path becomes a major operational limitation. The customer did not like the trade-offs for either of these approaches.
Journal Article

Automated Metrology Solution to Reduce Downtime and De-Skill Tooling Recertification

2012-09-10
2012-01-1869
Wing and fuselage aircraft structures require large precise tools for assembly. These large jigs require periodic re-certification to validate jig accuracy, yet metrology tasks involved may take the tool out of service for a week or more and typically require highly specialized personnel. Increasing the time between re-certifications adds the risk of making out-of-tolerance assemblies. How can we reduce jig re-certification down time without increasing the risk of using out-of-tolerance tooling? An alternative, successfully tested in a prototype tool, is to bring automated metrology tools to bear. Specifically, laser tracker measurements can be automated through a combination of off-the-shelf & custom software, careful line-of-sight planning, and permanent embedded targets. Retro-reflectors are placed at critical points throughout the jig. Inaccessible (out of reach) tool areas are addressed through the use of low cost, permanent, shielded repeatability targets.
Journal Article

Synthesizing Metrology Technologies to Reduce Engineering Time for Large CNC Machine Compensation

2011-10-18
2011-01-2780
Very large multi-axis CNC machines offer a special challenge for efficient and accurate machine compensation. Aerospace applications demand tight tolerances, but conventional compensation methods become expensive for large machines. Volumetric compensation offers an approach for reducing costs and improving accuracies. A unique control architecture enabled by volumetric compensation enables the use of a single part program by multiple machines. Combining multiple technologies (a proprietary volumetric compensation solver program, Spatial Analyzer, API's Active Target, a laser tracker and bespoke CNC-Tracker communication software for measurement triggering) significantly reduces machine compensation time. Available analysis tools also enable the engineer to evaluate measurement uncertainties and determine the best locations for additional stations as well as quantify the accuracy benefits such stations would offer.
Journal Article

Production Implementation of Multiple Machine, High Speed Fiber Placement for Large Structures

2010-09-28
2010-01-1877
A two machine Automated Fiber Placement (AFP) cell capable of laying 1/2\mi and 1/4\mi tow at rates up to 1800\mi/min (45.7 m/min), including feeds and cuts, has been implemented for the manufacture of large primary aircraft structures. The control architecture of the cell is such that part programs are machine independent and can run on either machine or simultaneously on both machines at the same time. A Central Cell Controller pushes part programs to each AFP machine and coordinates the cell. Volumetric accuracy of the two machines is under 0.008\mi (0.2 mm) radial error in the entire compensated envelop, which is approximately 64' x 21' x 14' (19.5 m x 6.4 m x 4.3 m) for each machine. This is accomplished through optimization of volumetric kinematic compensation parameters using a linear numerical solver. The machines reference a common coordinate system which allows great flexibility in part programming.